
Why is lease-up so important?
We’ve cracked the code with The High-Performance Lease-up Recipe below:
|
|
This Lease-up Recipe usually follows a 3-phase timeline.
The image below walks through Phase 1: Pre-Construction, Phase 2: Active Leasing, and Phase 3: Stabilization
