![Untitled design](https://svnrock.ca/wp-content/uploads/2024/06/Untitled-design.png)
Why is lease-up so important?
We’ve cracked the code with The High-Performance Lease-up Recipe below:
|
|
This Lease-up Recipe usually follows a 3-phase timeline.
The image below walks through Phase 1: Pre-Construction, Phase 2: Active Leasing, and Phase 3: Stabilization
![Screenshot 2024-06-04 at 4.13.13 PM](https://svnrock.ca/wp-content/uploads/2024/06/Screenshot-2024-06-04-at-4.13.13 PM.png)